2 ಸೀಸನ್
10 ಸಂಚಿಕೆ
Murder City - Season 1 Episode 1
When a 16-year-old girl disappears from her home, leaving a blood-spattered bedroom behind, Susan and Luke start trying to track down the missing teenager, hoping that she may still be alive. Meanwhile, the mysterious death of a City trader who is shot in the neck with an arrow proves a tough case to crack.
- ವರ್ಷ: 2006
- ದೇಶ:
- ಪ್ರಕಾರ: Drama
- ಸ್ಟುಡಿಯೋ: STV
- ಕೀವರ್ಡ್:
- ನಿರ್ದೇಶಕ:
- ಪಾತ್ರವರ್ಗ: Kris Marshall, Amanda Donohoe, Tim Woodward, Geff Francis, Alexis Conran, Amber Agar